Rev 1086 | Go to most recent revision | Blame | Compare with Previous | Last modification | View Log | RSS feed
----------------------------------
Jumping Balls demo
by
Paolo Gai 1999-2001 - pj@sssup.it
----------------------------------
This demo was created to show some S.Ha.R.K. functionalities in the course
of Informatica Industriale , University of Pavia, Italy.
The demo is composed by an application (derived by the template application
distributed on the web site) and two init files.
The demo is composed by:
MAKEFILE The makefile used to compile the application;
demo is the rule to compile the application with a CBS scheduler
demo2 is the rule to compile the application with a RR scheduler
README.TXT This file
DEMO.H Some constants used into the demo
INITFIL1.C The CBS initfile
INITFIL2.C The EDF initfile
INITFILE.C A makefile that cover either EDF+CBS and RR
BALL.C The Jumping balls part of the demo
DEMO.C The main() function and some other utility function
JETCTRL.C The JET part of the demo
The demo works as follows:
- It works at 640x480 16 bit colors
- on the left, there is the jumping ball arena, on the rigth there is the
statistics about the tasks into the system.
- the tasks are guaranteed using CBS and EDF. The wcet and mean execution
time on my portable after a few minutes are (us):
JetCtrl 7400 max 7500 CBS met
JetDummy 135 max 200 CBS met
JetSlide 2100 max 2100 CBS met
Balls 276 max 380 EDF wcet for hard ball,100 CBS met for soft ones
The system should go overloaded with 40 soft balls.
- The idea is the following:
- first, an edf guaranteed ball is created.
- then, create a set of soft ball using space. since their met is < than the
real met, they posticipate the deadlines.
- if they are killed, they remain for some seconds in the zombie state
- if a set of soft ball arde created (i.e., 10), and after a while all the
others are created, the bandwidth is fully used, and the task posticipate
their deadlines. the first set of tasks stops jumping when the bandwidth
is full utilized by the newest balls until all the tasks have similar
deadlines.
- Note on the left the slides that represents the relative ratio
between the tasks.
- Note that in overload conditions the EDF task is still guaranteed
- Note that PI is used with EDF, also if no theory says that it is good:
- S.Ha.R.K. allows that, it is the user that have to choose if that is
a non-sense
- PI is independent from the implemnentation of the scheduling modules
- if the second init file is used, RR is used instead of EDF+CBS.
- In overload condition RR perform differently from EDF+CBS, giving to
each task an equal fraction of bandwidth
- note also:
- the redefinition of the standard exception handler
- the redefinition of the keys and the initialization of the keyboard
- the myend exit function
- the main() that terminates
- the two parts (ball and jet) can be excluded using a #define
If You have any question, please contact the author...